When an existing commercial heating system reaches the end of its practical service life, a commercial electric boiler installation can provide a reliable and practical replacement heat source. For this project, three Vaillant electric boilers were installed as part of a new 84 kW heating system.
The new system needed to provide reliable space heating while integrating with the building’s existing heating infrastructure and higher operating pressure.
The Commercial Heating Challenge
The existing building heating system operates at a pressure exceeding 4 bar, while the selected Vaillant electric boilers have a maximum operating pressure of 3 bar.
This meant the new electric boilers could not be connected directly to the existing heating system.
The solution therefore incorporates hydraulic separation between the new low-pressure boiler circuit and the existing higher-pressure building heating system.
This approach allows the new commercial boiler plant to operate safely while retaining the existing heating distribution system wherever practical.
Commercial Electric Boiler Installation – The Solution
The commercial electric boiler installation uses three 28 kW Vaillant wall-hung electric boilers, providing a combined nominal heating capacity of 84 kW.
Rather than relying on one large boiler, the three electric boilers operate in cascade. This allows the heating output to be staged according to building demand.
Each boiler is individually isolated and connected to common 50 mm flow and return headers.
A Vaillant multiMATIC controller, control centre and cascade control cards manage the operation of the three boilers.
Hydraulic Separation With a Plate Heat Exchanger
A 100 kW brazed-plate heat exchanger provides hydraulic separation between the new electric boiler circuit and the building’s existing higher-pressure heating system.
New 50 mm press-fit stainless-steel flow and return pipework connects the heat exchanger to the existing heating headers.
This allows the new boiler installation to integrate with the existing infrastructure without unnecessarily replacing the complete building heating system.
Prefabricated Commercial Boiler Skid
To minimise disruption and reduce installation time on site, the boilers, headers and associated equipment were assembled onto a prefabricated boiler skid before delivery.
Prefabrication allows much of the mechanical work to be completed in a controlled workshop environment before the equipment reaches the plant room.
The compact skid arrangement also provides a tidy installation and improves access for future servicing and maintenance.
The commercial electric boiler installation incorporates:
Three 28 kW Vaillant electric boilers
Vaillant cascade boiler controls
Common 50 mm flow and return headers
Individual boiler isolation
Integral circulation pumps and expansion vessels
100 kW brazed-plate heat exchanger
50 mm stainless-steel press-fit pipework
Flow and return temperature gauges
Temperature probe points
Air release valves
Chemical dosing pot
Pressure-reducing system make-up valve
New cold-water make-up connection
Isolation valves and pipe supports
Improved Reliability and Easier Maintenance
Using three electric boilers instead of a single heat source provides several advantages for a commercial heating system.
The cascade controls allow the boilers to operate in stages, helping the heating plant respond to changing building demand.
The arrangement also provides partial redundancy. If one boiler needs to be isolated for servicing or repair, the remaining boilers can continue providing a level of heating capacity.
Individual isolation valves also allow maintenance to be carried out without necessarily shutting down the complete boiler plant.
A chemical dosing pot allows the new boiler circuit to be treated with a suitable corrosion inhibitor to help protect the boilers, pipework and associated equipment.
Integrating New Heating Equipment With Existing Systems
Upgrading a commercial heating system often involves more than simply selecting new heating equipment. Existing pipework, system pressures, available plant-room space, controls, and building services all need to be considered when designing a practical solution.
For this project, the completed commercial electric boiler system combines new heating technology with the building’s existing infrastructure, using a plate heat exchanger to accommodate the different operating pressures.
The result is a compact, serviceable, and practical heating solution designed around the existing plant room.
Commercial Boiler and Heating Solutions in New Zealand
Flow Industries and Flow Energy provide commercial and industrial heating and mechanical solutions throughout New Zealand.
Our capabilities include commercial boiler installations, heating system upgrades, plant-room upgrades, equipment procurement, prefabrication, stainless-steel pipework, mechanical installation, commissioning and ongoing maintenance.
Whether replacing ageing heating equipment, upgrading an existing boiler plant or integrating new technology into an established system, our focus is on delivering practical, reliable and maintainable solutions.
Planning a commercial heating or boiler upgrade? Contact our team to discuss a solution for your building or facility.